Generation Expansion Planning Based on Local Renewable Energy Resources: A Case Study of the Isolated Ambon-Seram Power System
Tumiran,
Lesnanto Multa Putranto,
Sarjiya,
Fransisco Danang Wijaya,
Adi Priyanto and
Ira Savitri
Additional contact information
Tumiran: Department of Electrical and Information Engineering, Universitas Gadjah Mada, Grafika Street No. 2, Yogyakarta 55281, Indonesia
Lesnanto Multa Putranto: Department of Electrical and Information Engineering, Universitas Gadjah Mada, Grafika Street No. 2, Yogyakarta 55281, Indonesia
Sarjiya: Department of Electrical and Information Engineering, Universitas Gadjah Mada, Grafika Street No. 2, Yogyakarta 55281, Indonesia
Fransisco Danang Wijaya: Department of Electrical and Information Engineering, Universitas Gadjah Mada, Grafika Street No. 2, Yogyakarta 55281, Indonesia
Adi Priyanto: PT PLN (Persero), Trunojoyo Street, Blok M-I No. 135, South Jakarta, DKI Jakarta 12160, Indonesia
Ira Savitri: PT PLN (Persero), Trunojoyo Street, Blok M-I No. 135, South Jakarta, DKI Jakarta 12160, Indonesia
Sustainability, 2022, vol. 14, issue 5, 1-21
Abstract:
Energy sustainability has become one of the main issues in power system planning in the Indonesian archipelago system, which has many small, isolated systems. For that purpose, green and sustainable generation expansion planning (GEP) procedures based on local energy resources is required. GEP is a necessary procedure for fulfilling electricity demand, which determines the generating units to be installed within a specified time horizon with minimal total costs as the objective function. This study uses GEP considering the interconnection option among the existing small scattered generation systems in Maluku: the isolated Ambon, Seram, Haruku, and Saparua systems. With interconnection, the utilization of local renewable energy sources would be increased, especially biomass, which has abundant potential in these areas. The GEP was simulated in the PLEXOS environment using mixed-integer linear programming (MILP). For comparison purposes, there were interconnection and isolated system scenarios. The results showed that the interconnection system would have a high share of a renewable energy source (RES) of up to 54% in 2050, most of which is biomass as the primary local energy source. The interconnection system scenario met the LOLP criteria and had a lower reserve margin and total costs than the isolated scenario, with USD 773.7 million.
Keywords: generation expansion planning; renewable energy integration; electrical energy mixed; system interconnection; isolated systems; generation system total cost (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
https://www.mdpi.com/2071-1050/14/5/3032/pdf (application/pdf)
https://www.mdpi.com/2071-1050/14/5/3032/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:14:y:2022:i:5:p:3032-:d:764446
Access Statistics for this article
Sustainability is currently edited by Ms. Alexandra Wu
More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().