Assessment of the Feasibility of Implementing a Flash Flood Early Warning System in a Small Catchment Area
Mariusz Starzec (),
Sabina Kordana-Obuch and
Daniel Słyś
Additional contact information
Mariusz Starzec: Department of Infrastructure and Water Management, Rzeszow University of Technology, al. Powstańców Warszawy 6, 35-959 Rzeszow, Poland
Sabina Kordana-Obuch: Department of Infrastructure and Water Management, Rzeszow University of Technology, al. Powstańców Warszawy 6, 35-959 Rzeszow, Poland
Daniel Słyś: Department of Infrastructure and Water Management, Rzeszow University of Technology, al. Powstańców Warszawy 6, 35-959 Rzeszow, Poland
Sustainability, 2023, vol. 15, issue 10, 1-43
Abstract:
The occurrence of flash floods is an increasingly common phenomenon. In many parts of the world, it is associated with an increase in the intensity of rainfall. Reducing the financial and social losses caused by the occurrence of local urban floods is possible through the use of hydrodynamic modeling and real-time flood forecasting. The purpose of this study is to assess the ability of the modeling technique to simulate the flow in a small catchment area and to determine the time remaining to reach the set warning and danger levels. SWMM 5.2 and QuantumGIS software were used in the study. The analysis showed that for the considered catchment area with a short length of the main stream (1612 m), the time possible for implementing countermeasures and evacuating the population is 70 to 120 min. The study also confirmed that short-term rainfall requires less depth to reach high stormwater elevations than long-term rainfall. In addition, a relationship was noted between the preceding rainfall and the height of stormwater and the forecast time. There was an unfavorable reduction in forecasting time as the depth of rainfall increased and its duration shortened. In the case of the analyzed catchment, the maximum elevation of stormwater ( E sw,max ) is generated by rainfall that is characterized by the highest intensity in the final phase of their duration. Similarly, the longest forecast time ( t f ) for the maximum stormwater elevation is caused by rainfall, which is characterized by the highest intensity in its final phase. The results of the study can significantly assist local governments when developing a catchment management plan and when trying to implement practices to minimize the negative effects of flash floods.
Keywords: storm water management model (SWMM); Bogdanowicz–Stachy rainfall model; flood hazard assessment; urban flash floods; regional implementation (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2023
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (4)
Downloads: (external link)
https://www.mdpi.com/2071-1050/15/10/8316/pdf (application/pdf)
https://www.mdpi.com/2071-1050/15/10/8316/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:15:y:2023:i:10:p:8316-:d:1151286
Access Statistics for this article
Sustainability is currently edited by Ms. Alexandra Wu
More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().