EconPapers    
Economics at your fingertips  
 

Two-Stage Optimization Scheduling of Virtual Power Plants Considering a User-Virtual Power Plant-Equipment Alliance Game

Yan Gao (), Long Gao, Pei Zhang and Qiang Wang
Additional contact information
Yan Gao: State Grid Baoding Electric Power Supply Company, Baoding 071000, China
Long Gao: State Grid Baoding Electric Power Supply Company, Baoding 071000, China
Pei Zhang: School of Electrical Engineering, Beijing Jiaotong University, Beijing 100044, China
Qiang Wang: State Grid Baoding Electric Power Supply Company, Baoding 071000, China

Sustainability, 2023, vol. 15, issue 18, 1-28

Abstract: Distributed renewable energy, loads, and power sources can be aggregated into virtual power plants (VPPs) to participate in energy market transactions and generate additional revenue. In order to better coordinate the transaction relationships among various entities within VPPs, this paper proposes a two-stage optimization model for VPPs that considers the user-VPP-equipment alliance. Firstly, starting from the basic structure of VPP, it is proposed to divide the alliances in VPP into two alliances: demand-side user-VPP and supply-side equipment-VPP. And a VPP optimization framework considering the cooperative game of the user-VPP-equipment alliance has been established. Then, a two-stage optimization model for VPPs was established considering the cooperative game of user-VPP-equipment alliance. The day-ahead optimization model takes economic and social benefits as the dual objectives, and the intraday optimization model aims to minimize the cost of deviation penalties. Secondly, taking into account the risk levels and comprehensive marginal benefits of various entities within the VPP, a profit distribution method combining improved Shapley values and independent risk contribution theory is adopted to allocate the total revenue of the VPP. The case results show that the operating cost has been reduced by 5.75%, the environmental cost has been reduced by 4.46%, and the total profit has increased by 29.52%. The model can improve the overall efficiency of VPPs.

Keywords: virtual power plants; cooperative game; energy and environmental cost; operation scheduling; profit distribution (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2023
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
https://www.mdpi.com/2071-1050/15/18/13960/pdf (application/pdf)
https://www.mdpi.com/2071-1050/15/18/13960/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:15:y:2023:i:18:p:13960-:d:1243912

Access Statistics for this article

Sustainability is currently edited by Ms. Alexandra Wu

More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().

 
Page updated 2025-03-19
Handle: RePEc:gam:jsusta:v:15:y:2023:i:18:p:13960-:d:1243912