EconPapers    
Economics at your fingertips  
 

Hydrological and Hydrodynamic Modeling for Flash Flood and Embankment Dam Break Scenario: Hazard Mapping of Extreme Storm Events

A’kif Al-Fugara (akifmohd@aabu.edu.jo), Ali Nouh Mabdeh, Saad Alayyash and Awni Khasawneh
Additional contact information
A’kif Al-Fugara: Department of Surveying Engineering, Faculty of Engineering, Al al-Bayt University, Mafraq 25113, Jordan
Ali Nouh Mabdeh: Department of Geographic Information Systems and Remote Sensing, Faculty of Earth and Environmental Sciences, Al al-Bayt University, Mafraq 25113, Jordan
Saad Alayyash: Department of Civil Engineering, Faculty of Engineering, Al al-Bayt University, Mafraq 25113, Jordan
Awni Khasawneh: Secretary General of Arab Union for Astronomy & Space Sciences, Amman 11953, Jordan

Sustainability, 2023, vol. 15, issue 3, 1-28

Abstract: Simulation of dam breach scenarios can help in the preparation of emergency action plans for real dam breaks or flash flooding events. The purpose of this study was to identify flood-prone areas in the Al Wala Valley in the governorate of Madaba in Jordan through analysis of the Al Wala Dam. Modelling of dam breaches was conducted under two scenarios: a Clear Day scenario and a Probable Maximum Flood (PMF) scenario. The former scenario does not address the various dam failure modes; rather, it addresses the formation and development of a breach as a result of structural failures like the sliding of dam blocks in the case of a concrete dam or piping failures in the case of embankment dams. The PMF scenarios, however, simulate unsteady flow in pipes and overtopping failure via consideration of runoff hydrography. In the PMF scenario, flood-prone areas can be identified by in-depth analysis of data from previous extreme rainfall events. The related hydrologic and hydraulic data can then be modelled using intensity-duration-frequency curves applied to an hour-by-hour simulation to discover the areas most at risk of flooding in the future. In the present study, data were collected from inlet of flow to Al Wala Valley on 10 January 2013. The collected data, which included rainfall and discharge data, were fed to the HEC-HMS software in order to calibrate the hydrological parameters of the watershed of the Al Wala Dam. Additionally, the HEC-RAS tool was employed to determine the breach outflow hydrography and hydraulic conditions across various critical downstream locations, which were determined by use of dynamic flood wave-routing models. The simulations revealed that, in the case of the Clear Day scenario, downstream inundation would cover an area of 5.262 km 2 in the event of a pipe failure. However, in the event of a six-hour storm, a twelve-hour storm, and a twenty-four-hour storm, the flooded area would rise to 6.837 km 2 , 8.518 km 2 , and 9.390 km 2 , respectively. In the event of an overtopping failure, 13.171 km 2 would be inundated, according to the Clear Day scenario. On the other hand, in the event of a six-hour storm, a twelve-hour storm, and a twenty four-hour storm, the flooded area would rise to 13.302 km 2 , 14.249 km 2 , and 14.594 km 2 , respectively.

Keywords: dam failure; inundation mapping; extreme storm events; hydrological models; Al Wala Dam (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2023
References: Add references at CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
https://www.mdpi.com/2071-1050/15/3/1758/pdf (application/pdf)
https://www.mdpi.com/2071-1050/15/3/1758/ (text/html)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:15:y:2023:i:3:p:1758-:d:1038395

Access Statistics for this article

Sustainability is currently edited by Ms. Alexandra Wu

More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager (indexing@mdpi.com).

 
Page updated 2024-12-28
Handle: RePEc:gam:jsusta:v:15:y:2023:i:3:p:1758-:d:1038395