Design Criteria for the Construction of Energy Storage Salt Cavern Considering Economic Benefits and Resource Utilization
Huiyong Song,
Song Zhu (),
Jinlong Li,
Zhuoteng Wang,
Qingdong Li and
Zexu Ning
Additional contact information
Huiyong Song: School of Health Economics and Management, Nanjing University of Chinese Medicine, Nanjing 210023, China
Song Zhu: Institute of Geotechnical Engineering, Zhejiang University, Hangzhou 310058, China
Jinlong Li: Institute of Geotechnical Engineering, Zhejiang University, Hangzhou 310058, China
Zhuoteng Wang: Institute of Geotechnical Engineering, Zhejiang University, Hangzhou 310058, China
Qingdong Li: Institute of Geotechnical Engineering, Zhejiang University, Hangzhou 310058, China
Zexu Ning: Institute of Geotechnical Engineering, Zhejiang University, Hangzhou 310058, China
Sustainability, 2023, vol. 15, issue 8, 1-16
Abstract:
Underground salt caverns have been widely used for oil and gas storage and have attracted increasing attention. The construction design of salt caverns is directly related to the final storage capacity, economic benefits, and resource utilization. However, due to the numerous combinations of multi-stage process parameters involved in the construction design, it is difficult to optimize them individually through indoor experiments and numerical simulations. In this regard, this paper attempts to put forward the basic principles of cavern construction design criteria with economic benefits and resource utilization as indicators. Firstly, 1258 groups of cavern construction process parameters were randomly generated under certain basic rules, including inner tube depth, outer tube depth, oil pad depth, duration, and water injection flow rate, for five direct leaching stages. Then, the cavern capacity, economic benefit, and rock salt resource utilization corresponding to these process parameters were obtained through batch processing using single-well salt cavern leaching simulation software (SSCLS). Finally, the influence laws of the distance between the inner tube and oil pad and lifting heights, and the rates of the inner tube and oil pad on the expected economic benefits and salt resource utilization, are discussed. In the actual project, it is recommended to increase the distance between the inner tube and the oil pad, increase the ratio of oil pad lifting height to duration, and use the appropriate lifting height to obtain greater expected revenue and resource utilization. This work will improve the efficiency and scientificity of cavern construction design, which is of great significance in guiding the construction and design for energy storage in salt caverns.
Keywords: rock salt energy storages; water solution mining; cavern construction process parameters; resource utilization; expected revenue (search for similar items in EconPapers)
JEL-codes: O13 Q Q0 Q2 Q3 Q5 Q56 (search for similar items in EconPapers)
Date: 2023
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
https://www.mdpi.com/2071-1050/15/8/6870/pdf (application/pdf)
https://www.mdpi.com/2071-1050/15/8/6870/ (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:gam:jsusta:v:15:y:2023:i:8:p:6870-:d:1127298
Access Statistics for this article
Sustainability is currently edited by Ms. Alexandra Wu
More articles in Sustainability from MDPI
Bibliographic data for series maintained by MDPI Indexing Manager ().