EconPapers    
Economics at your fingertips  
 

Dal controllo ex ante al controllo ex post: la rivoluzione della modernizzazione degli aiuti di Stato

Marco Boccaccio

No 22, Public Finance Research Papers from Istituto di Economia e Finanza, DSGE, Sapienza University of Rome

Abstract: Shifting control from ex ante to ex post: the revolution of state aid modernization. In 2012 European Commission started a comprehensive reform of state aid control. The core of the reform is Regulation n. 651/2014, which extends the exemption from notification obligation to a wide number of aid measures. This is not only a quantitative change but a qualitative one as well. Member states are called to verify the respect of the conditions for the exemption should comply with information obligations and in some cases must evaluate the effect of the aid measures adopted. This substantial shift from the traditional ex ante to ex post control should render easier for Member States to grant aids, which are assumed compatible with the internal market. Nevertheless, some fear the danger that an effective control will be weakened.

Keywords: European competition policy; state aid control; modernization (search for similar items in EconPapers)
JEL-codes: H H10 L88 (search for similar items in EconPapers)
Pages: 33 pages
Date: 2016-06
New Economics Papers: this item is included in nep-ger
References: Add references at CitEc
Citations:

Downloads: (external link)
https://www.dsge.uniroma1.it/sites/default/files/p ... conomia/e-pfrp22.pdf (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:gfe:pfrp00:00022

Access Statistics for this paper

More papers in Public Finance Research Papers from Istituto di Economia e Finanza, DSGE, Sapienza University of Rome Contact information at EDIRC.
Bibliographic data for series maintained by Valeria De Bonis ().

 
Page updated 2025-03-19
Handle: RePEc:gfe:pfrp00:00022