Community Outreach
Minh Ha-Duong,
Michèle Gaultier,
Benoît de Guillebon and
Gilles Mardon ()
Additional contact information
Michèle Gaultier: APESA [Pau]
Benoît de Guillebon: APESA [Pau]
Gilles Mardon: CIRED - centre international de recherche sur l'environnement et le développement - Cirad - Centre de Coopération Internationale en Recherche Agronomique pour le Développement - EHESS - École des hautes études en sciences sociales - AgroParisTech - ENPC - École nationale des ponts et chaussées - CNRS - Centre National de la Recherche Scientifique
Post-Print from HAL
Abstract:
This Project was one of the first integrated CCS projects in the world at this scale, and the first to be authorised in France. The social dynamics of this project were particularly interesting at the local level. The CO 2 storage site was close to a fairly densely populated area-the city of Pau and it's neighboring cities had nearly 150,000 inhabitants in 2007. The CCS chain started at the Lacq Industrial Facility (located 30km from the injection site). The communities around the Industrial Facility have been living for over 50 years with a high level of industrial activity near their homes, however, the communities nearest the storage area, tend to be semi-urban or rural with less familiarity of industry. After describing the local context, this chapter presents the local actors and describes the " concertation " 1 process that was led both before and after the official permit request for the Lacq Pilot Project. The final sections of the report present the results of a survey of the Jurançon population and the analysis of the press coverage from their project. 01: During a field visit,
Keywords: CCS carbon capture and storage; Acceptability; Lacq (search for similar items in EconPapers)
Date: 2015-09-15
New Economics Papers: this item is included in nep-ppm
Note: View the original document on HAL open archive server: https://hal.science/hal-01249956v1
References: View complete reference list from CitEc
Citations:
Published in Carbon capture and storage - The Lacq pilot. Project and injection period 2006-2013, Global Carbon Capture and Storage Institute (GCCSI); Total S.A., pp.216-241, 2015
Downloads: (external link)
https://hal.science/hal-01249956v1/document (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hal:journl:hal-01249956
Access Statistics for this paper
More papers in Post-Print from HAL
Bibliographic data for series maintained by CCSD ().