Mapping Systems engineering leading indicators with leading indicators in construction industry projects
Li Zheng (),
Claude Baron (),
Philippe Esteban (),
Rui Xue () and
Qiang Zhang ()
Additional contact information
Li Zheng: LAAS-ISI - Équipe Ingénierie Système et Intégration - LAAS - Laboratoire d'analyse et d'architecture des systèmes - UT Capitole - Université Toulouse Capitole - UT - Université de Toulouse - INSA Toulouse - Institut National des Sciences Appliquées - Toulouse - INSA - Institut National des Sciences Appliquées - UT - Université de Toulouse - UT2J - Université Toulouse - Jean Jaurès - UT - Université de Toulouse - UT3 - Université Toulouse III - Paul Sabatier - UT - Université de Toulouse - CNRS - Centre National de la Recherche Scientifique - Toulouse INP - Institut National Polytechnique (Toulouse) - UT - Université de Toulouse
Claude Baron: LESIA-INSA - Laboratoire d'Étude des Systèmes Informatiques et Automatiques - INSA Toulouse - Institut National des Sciences Appliquées - Toulouse - INSA - Institut National des Sciences Appliquées - UT - Université de Toulouse, LAAS-ISI - Équipe Ingénierie Système et Intégration - LAAS - Laboratoire d'analyse et d'architecture des systèmes - UT Capitole - Université Toulouse Capitole - UT - Université de Toulouse - INSA Toulouse - Institut National des Sciences Appliquées - Toulouse - INSA - Institut National des Sciences Appliquées - UT - Université de Toulouse - UT2J - Université Toulouse - Jean Jaurès - UT - Université de Toulouse - UT3 - Université Toulouse III - Paul Sabatier - UT - Université de Toulouse - CNRS - Centre National de la Recherche Scientifique - Toulouse INP - Institut National Polytechnique (Toulouse) - UT - Université de Toulouse
Philippe Esteban: LAAS-ISI - Équipe Ingénierie Système et Intégration - LAAS - Laboratoire d'analyse et d'architecture des systèmes - UT Capitole - Université Toulouse Capitole - UT - Université de Toulouse - INSA Toulouse - Institut National des Sciences Appliquées - Toulouse - INSA - Institut National des Sciences Appliquées - UT - Université de Toulouse - UT2J - Université Toulouse - Jean Jaurès - UT - Université de Toulouse - UT3 - Université Toulouse III - Paul Sabatier - UT - Université de Toulouse - CNRS - Centre National de la Recherche Scientifique - Toulouse INP - Institut National Polytechnique (Toulouse) - UT - Université de Toulouse
Rui Xue: Beijing University of Technology
Qiang Zhang: HFUT - Hefei University of Technology
Post-Print from HAL
Abstract:
Project performance measurement helps monitoring and controlling project processes, and thus improves project outcomes based on a set of indicators, typically lagging and leading indicators. Lagging indicators provide a comprehensive view on project health outcomes. Leading indicators are complementary; they can be used in a proactive way to enable companies to take corrective actions before performance decreases. But applying leading indicators on project management is not well developed because these indicators are difficult to be elaborated and interpreted. However, [Roedler et al., 2010] provided a great contribution to the state of art with a set of 18 leading indicators in the large domain of Systems Engineering. A deep analysis of literature also showed that some specific field of application, such as Civil Engineering, independently developed their own set of leading indicators. This paper thus analyzes and compares both sets of leading indicators in Systems Engineering and in Civil Engineering to point out similarities and differences, and to evaluate whether leading indicators defined in a field could be adapted to the other, with the goal to improve performance measurement by extending the current scope and structure of indicators. Mots clés-indicateurs avancés, Ingénierie Système, industrie du bâtiment, mesure de la performance de projet.
Keywords: project performance measurement; leading indicators; systems engineering; construction industry; indicateurs avancés; industrie du bâtiment; Ingénierie Système; mesure de la performance de projet (search for similar items in EconPapers)
Date: 2017-05-03
New Economics Papers: this item is included in nep-ppm
Note: View the original document on HAL open archive server: https://hal.science/hal-01709556v1
References: View references in EconPapers View complete reference list from CitEc
Citations:
Published in 12ème Congrès International de Génie Industriel (CIGI2017), May 2017, Compiègne, France. 10p
Downloads: (external link)
https://hal.science/hal-01709556v1/document (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hal:journl:hal-01709556
Access Statistics for this paper
More papers in Post-Print from HAL
Bibliographic data for series maintained by CCSD ().