EconPapers    
Economics at your fingertips  
 

Considering the systems engineering leading indicators to improve project performance measurement

Li Zheng (), Claude Baron (), Philippe Esteban (), Rui Xue and Qiang Zhang
Additional contact information
Li Zheng: LAAS-ISI - Équipe Ingénierie Système et Intégration - LAAS - Laboratoire d'analyse et d'architecture des systèmes - UT Capitole - Université Toulouse Capitole - UT - Université de Toulouse - INSA Toulouse - Institut National des Sciences Appliquées - Toulouse - INSA - Institut National des Sciences Appliquées - UT - Université de Toulouse - UT2J - Université Toulouse - Jean Jaurès - UT - Université de Toulouse - UT3 - Université Toulouse III - Paul Sabatier - UT - Université de Toulouse - CNRS - Centre National de la Recherche Scientifique - Toulouse INP - Institut National Polytechnique (Toulouse) - UT - Université de Toulouse
Claude Baron: LAAS-ISI - Équipe Ingénierie Système et Intégration - LAAS - Laboratoire d'analyse et d'architecture des systèmes - UT Capitole - Université Toulouse Capitole - UT - Université de Toulouse - INSA Toulouse - Institut National des Sciences Appliquées - Toulouse - INSA - Institut National des Sciences Appliquées - UT - Université de Toulouse - UT2J - Université Toulouse - Jean Jaurès - UT - Université de Toulouse - UT3 - Université Toulouse III - Paul Sabatier - UT - Université de Toulouse - CNRS - Centre National de la Recherche Scientifique - Toulouse INP - Institut National Polytechnique (Toulouse) - UT - Université de Toulouse
Philippe Esteban: LAAS-ISI - Équipe Ingénierie Système et Intégration - LAAS - Laboratoire d'analyse et d'architecture des systèmes - UT Capitole - Université Toulouse Capitole - UT - Université de Toulouse - INSA Toulouse - Institut National des Sciences Appliquées - Toulouse - INSA - Institut National des Sciences Appliquées - UT - Université de Toulouse - UT2J - Université Toulouse - Jean Jaurès - UT - Université de Toulouse - UT3 - Université Toulouse III - Paul Sabatier - UT - Université de Toulouse - CNRS - Centre National de la Recherche Scientifique - Toulouse INP - Institut National Polytechnique (Toulouse) - UT - Université de Toulouse
Rui Xue: LAAS-ISI - Équipe Ingénierie Système et Intégration - LAAS - Laboratoire d'analyse et d'architecture des systèmes - UT Capitole - Université Toulouse Capitole - UT - Université de Toulouse - INSA Toulouse - Institut National des Sciences Appliquées - Toulouse - INSA - Institut National des Sciences Appliquées - UT - Université de Toulouse - UT2J - Université Toulouse - Jean Jaurès - UT - Université de Toulouse - UT3 - Université Toulouse III - Paul Sabatier - UT - Université de Toulouse - CNRS - Centre National de la Recherche Scientifique - Toulouse INP - Institut National Polytechnique (Toulouse) - UT - Université de Toulouse

Post-Print from HAL

Abstract: With a long history in project management practices, project performance measurement (PPM) offers a wide range of methods and good practices which help project managers to effectively monitor the project and evaluate project progress and results. However, several critical issues remain, such as an unbalanced development of KPIs types or a limited availability of leading Key Performance Indicators (KPIs). On the other hand, systems engineering measurement (SEM) is a more recent discipline, with practices and theories that appeared with the emergence of the systems engineering discipline. Moreover, SEM has been much more developed with some practical research results published in several standards and guides. In particular, SEM does not only use lagging indicators, used to track how things are going but defines methods to promote leading indicators, used as precursors to the direction where the engineering is going; indeed, 18 leading indicators (LIs) were recently proposed, validated, and finally engineered in a practical guidance. Our goal being to improve project performance and success rate, one mean is to improve the project performance measurement, on which decisions rely for project management. To achieve this goal, this paper proposes to extend the project performance measurement of indicators by considering how performance is measured in systems engineering.

Keywords: KPIs; leading indicators; performance measurement; lagging indicators (search for similar items in EconPapers)
Date: 2017-07-09
New Economics Papers: this item is included in nep-exp and nep-ppm
Note: View the original document on HAL open archive server: https://laas.hal.science/hal-01710579v1
References: View references in EconPapers View complete reference list from CitEc
Citations:

Published in IFAC world congress, Jul 2017, Toulouse, France. 6p

Downloads: (external link)
https://laas.hal.science/hal-01710579v1/document (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:hal:journl:hal-01710579

Access Statistics for this paper

More papers in Post-Print from HAL
Bibliographic data for series maintained by CCSD ().

 
Page updated 2025-03-19
Handle: RePEc:hal:journl:hal-01710579