EconPapers    
Economics at your fingertips  
 

Modeling Uncertainty when Estimating IT Projects Costs

Michel Winter (), Isabelle Mirbel () and Pierre Crescenzo ()
Additional contact information
Michel Winter: UniCA - Université Côte d'Azur
Isabelle Mirbel: Laboratoire I3S - SPARKS - Scalable and Pervasive softwARe and Knowledge Systems - I3S - Laboratoire d'Informatique, Signaux, et Systèmes de Sophia Antipolis - UNS - Université Nice Sophia Antipolis (1965 - 2019) - CNRS - Centre National de la Recherche Scientifique - UniCA - Université Côte d'Azur
Pierre Crescenzo: Laboratoire I3S - SPARKS - Scalable and Pervasive softwARe and Knowledge Systems - I3S - Laboratoire d'Informatique, Signaux, et Systèmes de Sophia Antipolis - UNS - Université Nice Sophia Antipolis (1965 - 2019) - CNRS - Centre National de la Recherche Scientifique - UniCA - Université Côte d'Azur

Working Papers from HAL

Abstract: In the current economic context, optimizing projects' cost is an obligation for a company to remain competitive in its market. Introducing statistical uncertainty in cost estimation is a good way to tackle the risk of going too far while minimizing the project budget: it allows the company to determine the best possible trade-off between estimated cost and acceptable risk. In this paper, we present new statistical estimators derived from the way IT companies estimate the projects' costs. In the current practice, the software to develop is progressively divided into smaller pieces until it becomes easy to estimate the associated development workload and the workloads of the usual additionnal activities (documentation, test, project management,...) are deduced from the development workload by applying ratios. Finally, the total cost is derived from the resulting workload by applying a daily rate. This way, the overall workload cannot be calculated nor estimated analytically. We thus propose to use Monte-Carlo simulations on PERT and dependency graphs to obtain the cost distribution of the project.

Keywords: Monte-Carlo Method; Cost Estimation; IT Project; PERT (search for similar items in EconPapers)
Date: 2014-03-09
New Economics Papers: this item is included in nep-ppm
Note: View the original document on HAL open archive server: https://hal.science/hal-00966573
References: View references in EconPapers View complete reference list from CitEc
Citations:

Published in [Research Report] I3S, Université Côte d'Azur. 2014

Downloads: (external link)
https://hal.science/hal-00966573/document (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:hal:wpaper:hal-00966573

Access Statistics for this paper

More papers in Working Papers from HAL
Bibliographic data for series maintained by CCSD ().

 
Page updated 2025-03-19
Handle: RePEc:hal:wpaper:hal-00966573