Reliability Analysis of Apoly-12-PU-500
Girja Sharan,
Shah Nitin and
Srivastava Uma Kant
IIMA Working Papers from Indian Institute of Management Ahmedabad, Research and Publication Department
Abstract:
Breakdown data of APOLY-12-PU-500 windmills of Gujarat has been analysed. Bartlett’s test suggested the plausibility of failure being exponentially distributed. The mean-time-between-failures (MTBF) was estimated, expected failure frequency computed. The observed and expected frequencies are close enough, as indicated by the goodness-of-fit test. The MTBF worked out to 283 hrs. Which in Gujarat conditions could mean at the most 2 months of working. The reliability of this model thus is low. Repair costs will be higher than expected by the designers.
Date: 1986-05-01
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:iim:iimawp:wp00689
Access Statistics for this paper
More papers in IIMA Working Papers from Indian Institute of Management Ahmedabad, Research and Publication Department Contact information at EDIRC.
Bibliographic data for series maintained by ().