Designing Product Development Contracts in the Presence of Managerial Lobbying
Ying Bao (),
Mengze Shi () and
Ajay Kalra ()
Additional contact information
Ying Bao: Gies College of Business, University of Illinois at Urbana and Champaign, Champaign, Illinois 61820
Mengze Shi: Rotman School of Management, University of Toronto, Toronto, Ontario M5S 3E6, Canada
Ajay Kalra: Jones Graduate School of Business, Rice University, Houston, Texas 77005
Management Science, 2022, vol. 68, issue 9, 6797-6818
Abstract:
We examine a firm’s contract design problem in the context of allocating resources to new products with uncertain potential being developed by the managers vying for funds. The firm faces twin problems of identifying the right project(s) to prioritize them, and next also motivate the managers to exert effort in implementing the project to successful fruition. The firm’s contract design can incentivize the managers either using a resource-based incentive plan , which offers a reward based on the number of resources invested in the projects, or offering a resource-decoupled incentive plan , which provides a standard reward disregarding the differential amount of resources invested. We consider a set-up where the manager has private information about project quality. During the prioritizing first stage, we allow the manager to lobby for the project by manipulating the signal of the project quality. We show that a resource-decoupled incentive plan impacts the lobbying by encouraging the manager of the higher quality project to manipulate the quality signal more to stand out. Therefore, although a resource-based incentive plan is more efficient in inducing the manager in exerting implementation effort, a resource-decoupled incentive plan may be preferred as it leads to more accurate resource allocation. Thus, allowing lobbying that involves exaggeration may be beneficial by amplifying a firm’s ability to identify high caliber projects. We demonstrate the robustness of our results in models where the firm chooses the level of evaluation threshold, where there are multiple projects, and where the project evaluations involve a ranking procedure.
Keywords: contract design; project management; moral hazard; lobbying; managerial manipulation (search for similar items in EconPapers)
Date: 2022
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
http://dx.doi.org/10.1287/mnsc.2021.4217 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:ormnsc:v:68:y:2022:i:9:p:6797-6818
Access Statistics for this article
More articles in Management Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().