Synchronized Development of Production, Inventory, and Distribution Schedules
F. Fumero and
C. Vercellis
Additional contact information
F. Fumero: Dipartimento di Economia e Produzione, Politecnico di Milano, 120133 Milano, Italy
C. Vercellis: Dipartimento di Economia e Produzione, Politecnico di Milano, 120133 Milano, Italy
Transportation Science, 1999, vol. 33, issue 3, 330-340
Abstract:
An integrated optimization model for production and distribution planning is proposed, with the aim of optimally coordinating important and interrelated logistic decisions such as capacity management, inventory allocation, and vehicle routing. The integrated model is solved via Lagrangean relaxation and both lower bounds and heuristic feasible solutions are obtained. Computational results on test problems of various sizes are provided to show the effectiveness of the proposed solution scheme. Moreover, the feasible solution obtained is compared to that generated by an alternative decoupled approach in which a production plan is first developed and a distribution schedule is consequently derived. Computational results seem to indicate a substantial advantage of the synchronized approach over the decoupled decision process.
Date: 1999
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (66)
Downloads: (external link)
http://dx.doi.org/10.1287/trsc.33.3.330 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:ortrsc:v:33:y:1999:i:3:p:330-340
Access Statistics for this article
More articles in Transportation Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().