Interblock Crane Deployment in Container Terminals
Raymond K. Cheung,
Chung-Lun Li and
Wuqin Lin
Additional contact information
Raymond K. Cheung: Department of Industrial Engineering and Engineering Management, The Hong Kong University of Science and Technology, Clear Water Bay, Kowloon, Hong Kong
Chung-Lun Li: Department of Industrial Engineering and Engineering Management, The Hong Kong University of Science and Technology, Clear Water Bay, Kowloon, Hong Kong
Wuqin Lin: School of Industrial and Systems Engineering, Georgia Institute of Technology, Atlanta, Georgia 30332
Transportation Science, 2002, vol. 36, issue 1, 79-93
Abstract:
We consider the problem of scheduling the movements of cranes in a container storage yard so as to minimize the total unfinished workload at the end of each time period. The problem is formulated as a mixed-integer linear program, and the computational complexity ofthe problem is analyzed. A Lagrangian decomposition solution procedure is described. A new solution approach, called the successive piecewise-linear approximation method, is also developed. Through computational experiments, we show that our proposed solution methods are both efficient and effective for large-sized problems.
Date: 2002
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (24)
Downloads: (external link)
http://dx.doi.org/10.1287/trsc.36.1.79.568 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:inm:ortrsc:v:36:y:2002:i:1:p:79-93
Access Statistics for this article
More articles in Transportation Science from INFORMS Contact information at EDIRC.
Bibliographic data for series maintained by Chris Asher ().