The production function approach to the Belgian output gap, Estimation of a Multivariate Structural Time Series Model
Philippe Moës
No 89, Working Paper Research from National Bank of Belgium
Abstract:
A multivariate structural time series model is applied to the factor inputs of a production function (or components thereof) to estimate the Belgian output gap. The usefulness of capacity utilization is also investigated but the variable is not given a prominent status. The number of independent cycles - there may be more than one - and the frequencies retained in the cycles are not restricted a priori. To allow for leads and lags between variables, phase shifts à la Rünstler are introduced at a later stage. Additivity of leads and lags is not imposed. Over 1983-2004, a 3.5 years periodicity is found in the cycles. At that periodicity, the cycles in the participation and unemployment rates are negligible. Two independent cycles hide behind the cycles of the other variables: hours, TFP and capacity utilization. A common cycle restriction is rejected, even allowing for idiosyncratic cycles. The cycles present in the whole data set cannot be subsumed in a single measure such as capacity utilization. Phase shifts are significant, with hours leading by as much as 3 quarters and capacity utilization lagging but additivity of leads and lags is rejected. The resulting output gap has much in common with the NBB business survey indicator.
Keywords: Business cycle; output gap; phase shifts; structural time series models (search for similar items in EconPapers)
JEL-codes: C32 E32 (search for similar items in EconPapers)
Pages: 44 pages
Date: 2006-09
New Economics Papers: this item is included in nep-cba, nep-eff and nep-mac
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
https://www.nbb.be/doc/ts/publications/wp/wp89en.pdf (application/pdf)
Related works:
Journal Article: The production function approach to the Belgian output gap, estimation of a multivariate structural time series model (2006) 
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:nbb:reswpp:200609-1
Access Statistics for this paper
More papers in Working Paper Research from National Bank of Belgium Contact information at EDIRC.
Bibliographic data for series maintained by ().