Renegotiations in Public-Private Partnerships: Theory and Evidence
Itf
No 2014/17, International Transport Forum Discussion Papers from OECD Publishing
Abstract:
Public-private partnerships (PPPs) have the potential to increase efficiency and improve resource allocation. However, contract renegotiations are common and make us question the benefits to PPPs. Under current accounting standards, PPPs allow intertemporal reallocations of infrastructure spending that do not occur under traditional methods of procuring infrastructure and which allow governments to escape the constraints of congressional purview. We review the theoretical results in Engel et al. [2009a] as well as data from Colombia, Chile and Peru, comprising 610 highway PPPs and 540 renegotiations processes to verify these predictions. The data and original analysis comes from Bitran et al. [2013], complemented with additional descriptive statistics. The empirical evidence supports the predictions of the theoretical model.
JEL-codes: H21 L51 L91 (search for similar items in EconPapers)
Date: 2014-11-01
New Economics Papers: this item is included in nep-acc and nep-reg
References: Add references at CitEc
Citations:
Downloads: (external link)
https://doi.org/10.1787/5jrw2xxwdlr8-en (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:oec:itfaab:2014/17-en
Access Statistics for this paper
More papers in International Transport Forum Discussion Papers from OECD Publishing Contact information at EDIRC.
Bibliographic data for series maintained by ( this e-mail address is bad, please contact ).