Mega Solar Project & Amendment In NEPRA Distributed Generation & Net-Metering Regulation, 2015
Maria Ali
Additional contact information
Maria Ali: Pakistan Institute of Development Economics
No 2022:106, PIDE Webinar Brief from Pakistan Institute of Development Economics
Abstract:
The Quaid-e-Azam Solar Power Park was designed and built at the incorrect location. Bahawalpur’s climate is not suitable for the project. The temperature rises above 45 degrees Celsius, which does not produce the required amount of electricity. The project was designed to project 1000 MW of energy; however, up until this point, it has only generated 400 MW.
Pages: 4 pages
Date: 2022
New Economics Papers: this item is included in nep-ene, nep-env and nep-ppm
References: Add references at CitEc
Citations:
Downloads: (external link)
https://pide.org.pk/wp-content/uploads/wb-127-mega ... -regulation-2015.pdf First Version, 2022 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:pid:wbrief:2022:106
Access Statistics for this paper
More papers in PIDE Webinar Brief from Pakistan Institute of Development Economics Contact information at EDIRC.
Bibliographic data for series maintained by Khurram Iqbal ().