Risk Management Practice Adopted in Road Construction Project

Hemant Gain
Authors registered in the RePEc Author Service: Sreeramana Aithal

MPRA Paper from University Library of Munich, Germany

Abstract: Purpose: Zero risk construction is only a dream not reality as there is nothing certainity in the real world and scientists are only capable of coverting the same into risk with high level data science. The practice of risk management is an attempt to highlight risk elements with a case of urban road construction in Sindhupalchowk district, Province 3, Nepal. Design/Methodology/Approach: The 5-point Likert scale questionnaire survey was done to collect the primary data. Risk Management Practice is documented based on survey response in percentage through charts and graphs. Field visit were done for visual assessment of the construction procedure along with key informant interview and Secondary data of Detail Project Reports, Design and Drawings were effectively analyzed. Cronbach’s alpha was used to measure the reliability and triangulations were done for validity. Findings/Result: The results from this research indicates that contractor’s organization are averagely aware with a mean score of 3.30 about Risk Management Practice and averagely practicing risk management formally with mean score of 2.83. They are averagely analyzing risk management techniques with mean score of 3.07. Mean score is slightly higher based on client’s perspective with score for awareness being 3.93 and score for risk management being practiced formally is 3.13. Risk analysis score based on client’s management is 3.40. Mostly adopted technique of risk identification is monitoring and evaluation report of similar past projects and direct judgment is widely used technique for risk assessment of road construction projects at Sindhupalchowk district based on both client’s and contractor’s perspective. Risk response strategy based on contractor’s perspective is monitoring the risk and preparing contingency plan whereas that for client is transfer of risk. Originality/Value: It is action research which is significant for professionals to understand the practices of risk management being adopted by Nepalese Contractors in hilly region of Nepal.

Keywords: Risk; Practice; Identification; Assessment; Response (search for similar items in EconPapers)
JEL-codes: I31 (search for similar items in EconPapers)
Date: 2022-01-21
New Economics Papers: this item is included in nep-ban, nep-ppm and nep-rmg
References: View complete reference list from CitEc
Citations:

Published in International Journal of Management, Technology, and Social Sciences (IJMTS) 1.7(2022): pp. 21-36

Downloads: (external link)
https://mpra.ub.uni-muenchen.de/112055/1/MPRA_paper_112055.pdf original version (application/pdf)
https://mpra.ub.uni-muenchen.de/112055/2/MPRA_paper_112055.pdf original version (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:pra:mprapa:112055

Access Statistics for this paper

More papers in MPRA Paper from University Library of Munich, Germany Ludwigstraße 33, D-80539 Munich, Germany. Contact information at EDIRC.
Bibliographic data for series maintained by Joachim Winter ().

 
Page updated 2025-03-19
Handle: RePEc:pra:mprapa:112055