STRENGTHENING INFRASTRUCTURE: POWER SECTOR REFORMS- SOME VIABLE PROPOSALS FOR KERALA
Vijayamohanan Pillai N.
MPRA Paper from University Library of Munich, Germany
Abstract:
It goes without saying that the problems confronting the State Electricity Boards (SEBs) in India are just internal to them, and hence what the system requires is not any market-oriented restructuring, but an essence-specific reform that can remove the impediments that stand in the way of the SEBs’ improved performance. It is in this light that we propose some viable measures of reform meant for the Kerala power sector, covering all the stages of its functioning. Since the problems haunting the power sector start from the very first stage of capacity expansion planning itself, we suggest, to start with, a simple method of electricity demand projection for Kerala and discuss its implications. Then we discuss in detail some viable measures of reform for the Kerala power sector for its efficient functioning in the execution of expansion plans and operational performance.
Keywords: Power sector reforms; Kerala; inefficiency; demand projection (search for similar items in EconPapers)
JEL-codes: L94 L98 Q4 (search for similar items in EconPapers)
Date: 2008-05-26
New Economics Papers: this item is included in nep-cwa and nep-ene
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://mpra.ub.uni-muenchen.de/8869/1/MPRA_paper_8869.pdf original version (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:pra:mprapa:8869
Access Statistics for this paper
More papers in MPRA Paper from University Library of Munich, Germany Ludwigstraße 33, D-80539 Munich, Germany. Contact information at EDIRC.
Bibliographic data for series maintained by Joachim Winter ().