EconPapers    
Economics at your fingertips  
 

Introducing Learning Effects in Resource-constrained Project Scheduling

V. van Peteghem (), Mario Vanhoucke and -
Additional contact information
-: -

Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium from Ghent University, Faculty of Economics and Business Administration

Abstract: Learning effects assume that the efficiency of a resource increases with the duration of a task. Although these effects are commonly used in machine scheduling environments, they are rarely used in a project scheduling setting. In this paper, we study and model learning effects in a project scheduling environment and apply the model to the discrete time/resource trade-o_ scheduling problem (DTRTP), where each activity has a _fixed work content for which a set of execution modes (duration/resource requirement pairs) can be defined. Computational results emphasize the significant impact of learning effects on the project schedule, measure the margin of error made by ignoring learning and show that timely incorporation of learning effects can lead to significant makespan improvements.

Pages: 2 pages
Date: 2010-01
New Economics Papers: this item is included in nep-cmp and nep-ppm
References: Add references at CitEc
Citations:

Downloads: (external link)
http://wps-feb.ugent.be/Papers/wp_10_633.pdf (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:rug:rugwps:10/633

Access Statistics for this paper

More papers in Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium from Ghent University, Faculty of Economics and Business Administration Contact information at EDIRC.
Bibliographic data for series maintained by Nathalie Verhaeghe ().

 
Page updated 2025-03-19
Handle: RePEc:rug:rugwps:10/633