EconPapers    
Economics at your fingertips  
 

An Experimental Investigation of Metaheuristics for the Multi-Mode Resource-Constrained Project Scheduling Problem on New Dataset Instances

V. van Peteghem () and Mario Vanhoucke

Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium from Ghent University, Faculty of Economics and Business Administration

Abstract: In this paper, an overview is presented of the existing metaheuristic solution procedures to solve the multi-mode resource-constrained-project scheduling problem, in which multiple execution modes are available for each of the activities of the project. A fair comparison is made between the different metaheuristic algorithms on the existing benchmark datasets and on a newly generated dataset. Computational results are provided and recommendations for future research are formulated.

Pages: 2 pages
Date: 2011-11
New Economics Papers: this item is included in nep-cmp and nep-ppm
References: Add references at CitEc
Citations:

Downloads: (external link)
http://wps-feb.ugent.be/Papers/wp_11_758.pdf (application/pdf)

Related works:
Journal Article: An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances (2014) Downloads
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:rug:rugwps:11/758

Access Statistics for this paper

More papers in Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium from Ghent University, Faculty of Economics and Business Administration Contact information at EDIRC.
Bibliographic data for series maintained by Nathalie Verhaeghe ().

 
Page updated 2025-03-19
Handle: RePEc:rug:rugwps:11/758