Deadline-based incentive contracts in project management with cost salience
Zhihua Chen (),
Yanfei Lan (),
Ruiqing Zhao () and
Changjing Shang ()
Additional contact information
Zhihua Chen: Tianjin University
Yanfei Lan: Tianjin University
Ruiqing Zhao: Tianjin University
Changjing Shang: Aberystwyth University
Fuzzy Optimization and Decision Making, 2019, vol. 18, issue 4, No 3, 473 pages
Abstract:
Abstract The contractor’s procrastinating behavior owing to the psychology of cost salience exposes the project manager to the risk of time delay, which brings a significant challenge in project manager’s incentive contract design. This paper considers that a project manager pays a contractor over a menu of deadline-based incentive contracts to conduct a project which consists of two sequential tasks. The contractor is endowed with private cost salience information and unobservable efforts. The subjective assessments about the cost salience degree and the project variability are characterized as uncertain variables. Within the framework of uncertainty theory and principal-agent theory, we investigate the impacts of the existence of cost salience and information asymmetry on the incentive contract and the project manager’s profit. We confirm that cost salience can impel the project manager to lower both the fixed payment under full information and the penalty/incentive rate under pure moral hazard. Interestingly, we find that moral hazard can weaken the extent of inverse impact caused by the existence of cost salience for the project manager. Our study also shows that, for mitigating the adverse impacts brought by moral hazard, the project manager is more profitable to provide effort incentive when the contractor’s efforts are more productive or the project risk is in a higher level. Finally, other suggestions for mitigating the detrimental impacts brought by adverse selection are provided by numerical experiments.
Keywords: Uncertainty theory; Incentive mechanism; Project management; Information asymmetry; Cost salience (search for similar items in EconPapers)
Date: 2019
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
http://link.springer.com/10.1007/s10700-019-09302-y Abstract (text/html)
Access to the full text of the articles in this series is restricted.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:fuzodm:v:18:y:2019:i:4:d:10.1007_s10700-019-09302-y
Ordering information: This journal article can be ordered from
http://www.springer.com/journal/10700
DOI: 10.1007/s10700-019-09302-y
Access Statistics for this article
Fuzzy Optimization and Decision Making is currently edited by Shu-Cherng Fang and Boading Liu
More articles in Fuzzy Optimization and Decision Making from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().