Stochastic project management: multiple projects with multi-skilled human resources
Thomas Felberbauer (),
Walter J. Gutjahr () and
Karl F. Doerner ()
Additional contact information
Thomas Felberbauer: St. Pölten University of Applied Sciences
Walter J. Gutjahr: University of Vienna
Karl F. Doerner: University of Vienna
Journal of Scheduling, 2019, vol. 22, issue 3, No 2, 288 pages
Abstract:
Abstract This paper presents two stochastic optimization approaches for simultaneous project scheduling and personnel planning, extending a deterministic model previously developed by Heimerl and Kolisch. For the problem of assigning work packages to multi-skilled human resources with heterogeneous skills, the uncertainty on work package processing times is addressed. In the case where the required capacity exceeds the available capacity of internal resources, external human resources are used. The objective is to minimize the expected external costs. The first solution approach is a “matheuristic” based on a decomposition of the problem into a project scheduling subproblem and a staffing subproblem. An iterated local search procedure determines the project schedules, while the staffing subproblem is solved by means of the Frank–Wolfe algorithm for convex optimization. The second solution approach is sample average approximation where, based on sampled scenarios, the deterministic equivalent problem is solved through mixed-integer programming. Experimental results for synthetically generated test instances inspired by a real-world situation are provided, and some managerial insights are derived.
Keywords: Stochastic optimization; Project scheduling; Personnel planning; Heterogeneous skills; Iterated local search (search for similar items in EconPapers)
Date: 2019
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (5)
Downloads: (external link)
http://link.springer.com/10.1007/s10951-018-0592-y Abstract (text/html)
Access to the full text of the articles in this series is restricted.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:jsched:v:22:y:2019:i:3:d:10.1007_s10951-018-0592-y
Ordering information: This journal article can be ordered from
http://www.springer.com/journal/10951
DOI: 10.1007/s10951-018-0592-y
Access Statistics for this article
Journal of Scheduling is currently edited by Edmund Burke and Michael Pinedo
More articles in Journal of Scheduling from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().