Straightening machine preventive maintenance intervention plan based on AHP: a case study in a steel company in Brazil

Ualison Rébula De Oliveira (), Hilda Anatiely Donato Souza (), Carlos Augusto Gabriel Menezes () and Henrique Martins Rocha ()
Additional contact information
Ualison Rébula De Oliveira: Universidade Federal Fluminense (UFF) / MPA-PPGA, MSG and PPSIG
Hilda Anatiely Donato Souza: Universidade Federal Fluminense (UFF)
Carlos Augusto Gabriel Menezes: Universidade Estadual Júlio de Mesquita Filho (UNESP)
Henrique Martins Rocha: Universidade do Estado do Rio de Janeiro (UERJ)

Operations Management Research, 2023, vol. 16, issue 3, No 28, 1577-1593

Abstract: Abstract Equipment failure and production shortfalls can cause significant impacts on companies. Preventive maintenance can potentially increase equipment reliability and availability, helping companies achieve their corporate goals while reducing operation and maintenance costs. However, determining the optimal interval between maintenance interventions involves balancing various factors such as maintenance costs, equipment availability, risk of failures, and the need for corrective maintenance, as well as potential operational and financial impacts. Under this context, this paper aims to define the interval between preventive maintenance interventions for a key production equipment in a steel company located in Southeast region of Brazil. Upon documental analysis and interviews with experts, an AHP was applied to hierarchize the maintenance periodicity, based on the following criteria: part replacement based on service life, downtime hours for preventive maintenance, equipment reliability, and cost of materials and labour. A biweekly preventive maintenance periodicity was identified as the most adequate for the analysed device. An implementation plan was approved and preliminary results indicate no availability deterioration, while maintenance costs are below historical average.

Keywords: Preventive maintenance; Maintenance plans; Equipment availability; Periodicity; Multicriteria decision; Analytic Hierarchy process (search for similar items in EconPapers)
Date: 2023
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
http://link.springer.com/10.1007/s12063-023-00368-x Abstract (text/html)
Access to the full text of the articles in this series is restricted.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:opmare:v:16:y:2023:i:3:d:10.1007_s12063-023-00368-x

Ordering information: This journal article can be ordered from
http://www.springer.com/journal/12063

DOI: 10.1007/s12063-023-00368-x

Access Statistics for this article

Operations Management Research is currently edited by Jan Olhager and Scott Shafer

More articles in Operations Management Research from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-03-20
Handle: RePEc:spr:opmare:v:16:y:2023:i:3:d:10.1007_s12063-023-00368-x