Long-Term Scheduling of Cascade Reservoirs Considering Inflow Forecasting Uncertainty Based on a Disaggregation Model

Xiaoling Ding, Xiaocong Mo, Jianzhong Zhou (), Sheng Bi, Benjun Jia and Xiang Liao
Additional contact information
Xiaoling Ding: Huazhong University of Science and Technology
Xiaocong Mo: Changjiang River Scientific Research Institute of Changjiang Water Resource Commission
Jianzhong Zhou: Huazhong University of Science and Technology
Sheng Bi: Changjiang River Scientific Research Institute of Changjiang Water Resource Commission
Benjun Jia: Huazhong University of Science and Technology
Xiang Liao: Hubei University of technology

Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), 2021, vol. 35, issue 2, No 13, 645-660

Abstract: Abstract Forecasted inflow is one of the most important input information for reservoir operation planning. However, current inflow prediction accuracy is difficult to meet the needs of long-term operation. Therefore, it is of great significance to consider the uncertainty of inflow forecast and study its influence on reservoir operation decisions. In this paper, a long-term scheduling framework considering inflow forecast uncertainty based on a temporal disaggregation method is proposed. First, the uncertainty of forecast is described from two aspects. Gaussian distribution is used to simulate the annual forecast error, and an Adaptive Nearest Neighbor Gaussian sampling method (A-NGS) is proposed to decompose annual inflow into temporal series. Based on the implicit scheduling model, the sample set of generation scheduling plans, actual dispatching schemes and theoretical optimal results are constructed. On this basis, a series of indexes are presented to evaluate the inflow simulation performance and the scheduling benefits. A case study of the Xiluodu-Xiangjiaba cascade reservoirs is conducted to analyze the effects of forecast uncertainty on operation benefits, and the effectiveness of forecast information is identified. Compared with the deterministic fragment method, the inflow processes simulated by A-NGS achieve better precision and behave more conducive to the scheduling. Although the uncertainty of forecast errors will bring some hydropower generation losses, a certain degree of forecast accuracy is effective to improve scheduling benefits when in the electricity market.

Keywords: Long-term reservoir operation; Hydro generation benefit; Inflow forecast uncertainty; Effectiveness of forecast error; Hydrology temporal disaggregating method (search for similar items in EconPapers)
Date: 2021
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
http://link.springer.com/10.1007/s11269-020-02748-5 Abstract (text/html)
Access to the full text of the articles in this series is restricted.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:waterr:v:35:y:2021:i:2:d:10.1007_s11269-020-02748-5

Ordering information: This journal article can be ordered from
http://www.springer.com/economics/journal/11269

DOI: 10.1007/s11269-020-02748-5

Access Statistics for this article

Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA) is currently edited by G. Tsakiris

More articles in Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA) from Springer, European Water Resources Association (EWRA)
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-03-20
Handle: RePEc:spr:waterr:v:35:y:2021:i:2:d:10.1007_s11269-020-02748-5