EconPapers    
Economics at your fingertips  
 

An Improved Peaks-Over-Threshold Method and its Application in the Time-Varying Design Flood

Jiqing Li (), Jing Huang (), Xuefeng Chu () and Jay R. Lund ()
Additional contact information
Jiqing Li: North China Electric Power University
Jing Huang: North China Electric Power University
Xuefeng Chu: North Dakota State University
Jay R. Lund: University of California, Davis

Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), 2021, vol. 35, issue 3, No 10, 933-948

Abstract: Abstract Design flood, which plays a paramount role in reservoir construction and operation, is often calculated by the annual maximum sampling method (AMSM). However, the AMSM can only use a small amount of data and reflect the extreme value distribution of inflow flood. As a result, the annual maximum design flood or the seasonal design flood is not sufficient to formulate the reservoir operation scheme in whole life cycle. Currently, studies analyzing the sample selection method of design flood and the way to make design flood close to inflow flood are rare. To this end, an improved peaks-over-threshold method (IPOT) was designed. Together with the time-varying parameters with Poisson distribution model, we used the IPOT to calculate a new type time-varying design flood in this study and took Longyangxia Reservoir in China as a case study. Results indicate that, compared with the AMSM, the IPOT enhances the physical correlation between sample individuals by increasing data use rate and determines the optimal threshold, which avoids the influence of human factors on the sample selection. Moreover, the time-varying design flood can fully reflect the characteristics of inflow flood and combine the design flood value with time and probability to establish an inflow flood identification model. According to this model, managers can assess the probability and type of inflow flood and choose the appropriate reservoir operation scheme. Findings of this study, including the IPOT, the time-varying design flood and the inflow flood identification model are helpful for water resources planning and management.

Keywords: Improved peaks-over-threshold method (IPOT); Optimal threshold selection criteria; Time-varying design flood; Inflow flood identification model; Time-varying parameters with Poisson distribution model (search for similar items in EconPapers)
Date: 2021
References: View references in EconPapers View complete reference list from CitEc
Citations:

Downloads: (external link)
http://link.springer.com/10.1007/s11269-020-02758-3 Abstract (text/html)
Access to the full text of the articles in this series is restricted.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:waterr:v:35:y:2021:i:3:d:10.1007_s11269-020-02758-3

Ordering information: This journal article can be ordered from
http://www.springer.com/economics/journal/11269

DOI: 10.1007/s11269-020-02758-3

Access Statistics for this article

Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA) is currently edited by G. Tsakiris

More articles in Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA) from Springer, European Water Resources Association (EWRA)
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-03-20
Handle: RePEc:spr:waterr:v:35:y:2021:i:3:d:10.1007_s11269-020-02758-3