A comparative study of factors affecting the external stakeholder management process
Stefan Olander and
Anne Landin
Construction Management and Economics, 2008, vol. 26, issue 6, 553-561
Abstract:
There is a natural tendency for stakeholder groups to try to influence the implementation of construction projects in line with their individual concerns and needs. This presents a challenge for construction project managers in analysing and managing these various concerns and needs in a stakeholder management process falling within the limits of the project. The aim of the research presented here was to show the factors affecting the stakeholder management process positively or negatively from the perspective of project implementation. A comparative study of two railway projects in Sweden was undertaken to analyse these factors. The study showed that the outcome of the stakeholder management process depended mainly upon how well the project managers presented the benefits and negative consequences brought on by the construction project. Techniques and tools exist for this purpose, but must be appropriate, and these are discussed in the context of the two projects. The challenge for project managers is to implement the project in such a way that the effects of negative impacts are minimized and, if possible, the benefits for all stakeholders are maximized. Project managers must communicate and interact with stakeholders so that the perceived benefits and negative impacts are realistically defined.
Keywords: Customer relations; stakeholder; railways; Sweden (search for similar items in EconPapers)
Date: 2008
References: View complete reference list from CitEc
Citations: View citations in EconPapers (14)
Downloads: (external link)
http://www.tandfonline.com/doi/abs/10.1080/01446190701821810 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:conmgt:v:26:y:2008:i:6:p:553-561
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RCME20
DOI: 10.1080/01446190701821810
Access Statistics for this article
Construction Management and Economics is currently edited by Will Hughes
More articles in Construction Management and Economics from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().