Contract stability in European road infrastructure PPPs: how does governmental PPP support contribute to preventing contract renegotiation?
Raden Murwantara Soecipto and
Koen Verhoest
Public Management Review, 2018, vol. 20, issue 8, 1145-1164
Abstract:
In the last decade a considerable number of PPP contracts in Europe turned out to be instable and were renegotiated. This paper studies which combinations of conditions in terms of macro-level business environment and governmental PPP support and at project-level (remuneration scheme, risk allocation, project age and contract duration) contribute to avoid contract renegotiation, by conducting a qualitative comparative analysis of twenty five European road infrastructure projects. Results show that although the broader macro-level business environment has a clear contribution, contract stability can benefit from an availability-based remuneration scheme and a well-developed governmental PPP support in combination with other conditions.
Date: 2018
References: Add references at CitEc
Citations: View citations in EconPapers (9)
Downloads: (external link)
http://hdl.handle.net/10.1080/14719037.2018.1428414 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:rpxmxx:v:20:y:2018:i:8:p:1145-1164
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/rpxm20
DOI: 10.1080/14719037.2018.1428414
Access Statistics for this article
Public Management Review is currently edited by Stephen P. Osborne
More articles in Public Management Review from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().