Issues and challenges of reclaimed water usage: a case study of the dragon-shaped river in the Beijing Olympic Park
Xiaoqin Zhou,
Zifu Li,
Chad Staddon,
Xuejun Wu and
Han Song
Water International, 2017, vol. 42, issue 4, 486-494
Abstract:
Increased use of reclaimed water could be one of the solutions to Beijing’s growing water shortage, particularly for non-potable (e.g. landscaping) purposes. The dragon-shaped river, a large artificial waterscape built on the site of the 2008 Beijing Olympic games, offers a useful case study of the issues and challenges attendant on wastewater reclamation and reuse. Of particular interest is the use of phytoremediation techniques for bioremediation of nutrient loads. This article presents the results of ongoing monitoring which indicate that phytoremediation is succeeding in preventing eutrophication, though some challenges, notably management of aquatic biomass, remain.
Date: 2017
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
http://hdl.handle.net/10.1080/02508060.2017.1331409 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:rwinxx:v:42:y:2017:i:4:p:486-494
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/rwin20
DOI: 10.1080/02508060.2017.1331409
Access Statistics for this article
Water International is currently edited by James Nickum, Philippus Wester, Remy Kinna, Xueliang Cai, Yoram Eckstein, Naho Mirumachi and Cecilia Tortajada
More articles in Water International from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().