Capital Equipment Replacement Under Technological Change
Farid Mardin and
Takeshi Arai
The Engineering Economist, 2012, vol. 57, issue 2, 119-129
Abstract:
In this article, one of the commonly used replacement decision methods, the challenger–defender (CD) method, is modified. The proposed method is shown to outperform the original CD method and, in some cases, it outperforms the original economic life (EL) method. When the annual multiplier for the purchase price (a) is higher than that for the new asset operating and maintenance (O&M) costs (q), the solution of the modified CD method is more advantageous compared with the EL method when the new asset O&M costs purchased at time 0 (A) are higher. Furthermore, this modified CD method is more advantageous compared to the two-replacement-cycle method when the annual effective discount rate (d) is higher.
Date: 2012
References: Add references at CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
http://hdl.handle.net/10.1080/0013791X.2012.677112 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:uteexx:v:57:y:2012:i:2:p:119-129
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/UTEE20
DOI: 10.1080/0013791X.2012.677112
Access Statistics for this article
The Engineering Economist is currently edited by Sarah Ryan
More articles in The Engineering Economist from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().