EconPapers    
Economics at your fingertips  
 

Analyzing the Techno-Economic Determinants for the Repowering of Wind Farms

Anxo Silvosa, Guillermo Gómez and Pablo Río

The Engineering Economist, 2013, vol. 58, issue 4, 282-303

Abstract: The aim of this article is to identify the relative importance of technical and economic variables in the financial feasibility of repowering wind farm projects. A financial valuation model is developed. We carry out a sensitivity analysis with several variables considered to be key in the repowering decision. The most relevant technical variable is the increase in production efficiency and the most relevant economic variable is the capital expenditures in new equipment. Furthermore, the decision to repower critically depends upon the level of support being provided. The repowering project would not be feasible in the absence of support.

Date: 2013
References: Add references at CitEc
Citations: View citations in EconPapers (3)

Downloads: (external link)
http://hdl.handle.net/10.1080/0013791X.2013.814737 (text/html)
Access to full text is restricted to subscribers.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:taf:uteexx:v:58:y:2013:i:4:p:282-303

Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/UTEE20

DOI: 10.1080/0013791X.2013.814737

Access Statistics for this article

The Engineering Economist is currently edited by Sarah Ryan

More articles in The Engineering Economist from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().

 
Page updated 2025-03-20
Handle: RePEc:taf:uteexx:v:58:y:2013:i:4:p:282-303