Analyzing the Techno-Economic Determinants for the Repowering of Wind Farms
Anxo Silvosa,
Guillermo Gómez and
Pablo Río
The Engineering Economist, 2013, vol. 58, issue 4, 282-303
Abstract:
The aim of this article is to identify the relative importance of technical and economic variables in the financial feasibility of repowering wind farm projects. A financial valuation model is developed. We carry out a sensitivity analysis with several variables considered to be key in the repowering decision. The most relevant technical variable is the increase in production efficiency and the most relevant economic variable is the capital expenditures in new equipment. Furthermore, the decision to repower critically depends upon the level of support being provided. The repowering project would not be feasible in the absence of support.
Date: 2013
References: Add references at CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
http://hdl.handle.net/10.1080/0013791X.2013.814737 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:uteexx:v:58:y:2013:i:4:p:282-303
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/UTEE20
DOI: 10.1080/0013791X.2013.814737
Access Statistics for this article
The Engineering Economist is currently edited by Sarah Ryan
More articles in The Engineering Economist from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().