A comparison of different project duration forecasting methods using earned value metrics
S. Vandevoorde and
Mario Vanhoucke
Vlerick Leuven Gent Management School Working Paper Series from Vlerick Leuven Gent Management School
Abstract:
Earned value project management is a well-known management system that integrates cost, schedule and technical performance. It allows the calculation of cost and schedule variances and performance indices and forecasts of project cost and schedule duration. The earned value method provides early indications of project performance to highlight the need for eventual corrective action. Earned value management was originally developed for cost management and has not widely been used for forecasting project duration. However, recent research trends show an increase of interest to use performance indicators for predicting total project duration. In this paper, we give an overview of the state-of-the-art knowledge for this new research trend to bring clarity in the often confusing terminology. The purpose of this paper is three-fold. First, we compare the classic earned value performance indicators SV & SPI with the newly developed earned schedule performance indicators SV(t) & SPI(t). Next, we present a generic schedule forecasting formula applicable in different project situations and compare the three methods from literature to forecast total project duration. Finally, we illustrate the use of each method on a simple one activity example project and on real-life project data.
Keywords: Earned value; earned duration; earned schedule; project duration forecasting (search for similar items in EconPapers)
Pages: 31 pages
Date: 2005-10-05
New Economics Papers: this item is included in nep-for
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.vlerick.be/en/5782-VLK/version/default/ ... vlgms-wp-2005-16.pdf (application/pdf)
Our link check indicates that this URL is bad, the error code is: 404 Not Found (http://www.vlerick.be/en/5782-VLK/version/default/part/AttachmentData/data/vlgms-wp-2005-16.pdf [301 Moved Permanently]--> https://www.vlerick.com/en/5782-VLK/version/default/part/AttachmentData/data/vlgms-wp-2005-16.pdf)
Related works:
Working Paper: A Comparison of Different Project Duration Forecasting Methods using Earned Value Metrics (2005) 
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:vlg:vlgwps:2005-16
Access Statistics for this paper
More papers in Vlerick Leuven Gent Management School Working Paper Series from Vlerick Leuven Gent Management School Contact information at EDIRC.
Bibliographic data for series maintained by Isabelle Vandenbroere ().