Pre-emptive resource-constrained project scheduling with setup times
D. Debels and
Mario Vanhoucke
Vlerick Leuven Gent Management School Working Paper Series from Vlerick Leuven Gent Management School
Abstract:
Resource-constrained project scheduling with activity pre-emption assumes that activities are allowed to be interrupted and restarted later in the schedule at no extra cost. In the current paper, we extend this pre-emptive scheduling problem with setup times between activity interruptions and the possibility to fast track pre-emptive subparts of activities. The contribution of the paper is twofold. First, we present an optimal branch-and-bound procedure for the pre-emptive resource-constrained project scheduling problem with setup times and fast tracking options. Second, we test the impact of these pre-emptive extensions to the quality of the schedule from a lead-time point-of-view.
Pages: 37 pages
Date: 2006-06-05
New Economics Papers: this item is included in nep-bec
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.vlerick.be/en/2482-VLK/version/default/ ... vlgms-wp-2006-19.pdf (application/pdf)
Our link check indicates that this URL is bad, the error code is: 404 Not Found (http://www.vlerick.be/en/2482-VLK/version/default/part/AttachmentData/data/vlgms-wp-2006-19.pdf [301 Moved Permanently]--> https://www.vlerick.com/en/2482-VLK/version/default/part/AttachmentData/data/vlgms-wp-2006-19.pdf)
Related works:
Working Paper: Pre-emptive resource-constrained project scheduling with setup times (2006) 
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:vlg:vlgwps:2006-19
Access Statistics for this paper
More papers in Vlerick Leuven Gent Management School Working Paper Series from Vlerick Leuven Gent Management School Contact information at EDIRC.
Bibliographic data for series maintained by Isabelle Vandenbroere ().