Details about Barbara Gładysz
Access statistics for papers by Barbara Gładysz.
Last updated 2011-01-23. Update your information in the RePEc Author Service.
Short-id: pga532
Jump to Journal Articles
Journal Articles
2010
- A method for detecting outliers in fuzzy regression
Operations Research and Decisions, 2010, 20, (2), 25-40
2009
- Method of determining the value of an electrical energy contract
Operations Research and Decisions, 2009, 19, (3), 19-26
2008
- Application of regression trees in the analysis of electricity load
Operations Research and Decisions, 2008, 18, (4), 19-28 View citations (1)
- Estimation of long-term project risk during project realization – combination of the earned value and present value methods
Operations Research and Decisions, 2008, 18, (3), 5-15
2003
- Minimization of the expected number of late jobs in a single machine system with fuzzy processing times and fuzzy due dates
Operations Research and Decisions, 2003, 13, (4), 35-42
- The two-machine open shop problem with fuzzy processing times
Operations Research and Decisions, 2003, 13, (4), 43-47
|
The links between different versions of a paper are constructed automatically by matching on the titles.
Please contact if a link is incorrect.
Use this form
to add links between versions where the titles do not match.
|