Estimation of long-term project risk during project realization – combination of the earned value and present value methods

Barbara Gładysz and Dorota Kuchta

Operations Research and Decisions, 2008, vol. 18, issue 3, 5-15

Abstract: The paper proposes a combination of two methods: the Net Present Value Method and the Earned Value Method – to control the risk of not achieving the targeted value of long-term projects. The method is capable, like the Earned Value Method, to forecast future financial overruns ahead of time and to warn the project manager long before the event itself occurs so that the project manager has time to handle the problem. On the other hand, the proposed method is able, like the Net Present Value, to take the time value of money into account.

Keywords: Net Present Value Method; Earned Value Method; project; risk (search for similar items in EconPapers)
Date: 2008
References: Add references at CitEc
Citations:

Downloads: (external link)
https://ord.pwr.edu.pl/assets/papers_archive/103%20-%20published.pdf (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:wut:journl:v:3:y:2008:p:5-15

Access Statistics for this article

More articles in Operations Research and Decisions from Wroclaw University of Science and Technology, Faculty of Management Contact information at EDIRC.
Bibliographic data for series maintained by Adam Kasperski ().

 
Page updated 2025-03-20
Handle: RePEc:wut:journl:v:3:y:2008:p:5-15