EconPapers    
Economics at your fingertips  
 

Details about Chin-Chia Wu

Homepage:http://www.stat.fcu.edu.tw/wSite/ct?xItem=677fa2739db02b7e&ctNode=34492&mp=440101&submit=%E5%
Workplace:Feng Chia University, Department of Statistics

Access statistics for papers by Chin-Chia Wu.

Last updated 2020-03-17. Update your information in the RePEc Author Service.

Short-id: pwu178


Jump to Journal Articles

Journal Articles

2018

  1. Integrated production, inventory, and batch delivery scheduling with due date assignment and two competing agents
    Naval Research Logistics (NRL), 2018, 65, (5), 393-409 Downloads View citations (10)
  2. Metaheuristics for Order Scheduling Problem with Unequal Ready Times
    Discrete Dynamics in Nature and Society, 2018, 2018, 1-13 Downloads
  3. Single-machine scheduling and common due date assignment with potential machine disruption
    International Journal of Production Research, 2018, 56, (3), 1345-1360 Downloads View citations (6)

2017

  1. Two-agent flowshop scheduling to maximize the weighted number of just-in-time jobs
    Journal of Scheduling, 2017, 20, (4), 313-335 Downloads View citations (6)

2016

  1. Just-in-time scheduling with two competing agents on unrelated parallel machines
    Omega, 2016, 63, (C), 41-47 Downloads View citations (20)

2015

  1. Scheduling Problems with Due Date Assignment
    Discrete Dynamics in Nature and Society, 2015, 2015, 1-2 Downloads

2014

  1. Parallel-Machine Scheduling to Minimize Flowtime, Holding, and Batch Delivery Costs
    Asia-Pacific Journal of Operational Research (APJOR), 2014, 31, (06), 1-17 Downloads View citations (1)

2013

  1. Two-machine flowshop scheduling with a truncated learning function to minimize the makespan
    International Journal of Production Economics, 2013, 141, (1), 79-86 Downloads View citations (13)

2010

  1. Single machine scheduling with sequence-dependent family setups to minimize maximum lateness
    Journal of the Operational Research Society, 2010, 61, (7), 1181-1189 Downloads View citations (3)

2004

  1. Minimizing total completion time in a two-machine flowshop with a learning effect
    International Journal of Production Economics, 2004, 88, (1), 85-93 Downloads View citations (13)
 
Page updated 2025-03-22