EconPapers    
Economics at your fingertips  
 

Two-agent flowshop scheduling to maximize the weighted number of just-in-time jobs

Yunqiang Yin (), T. C. E. Cheng, Du-Juan Wang () and Chin-Chia Wu
Additional contact information
Yunqiang Yin: Kunming University of Science and Technology
T. C. E. Cheng: The Hong Kong Polytechnic University
Du-Juan Wang: Dalian Maritime University

Journal of Scheduling, 2017, vol. 20, issue 4, No 1, 313-335

Abstract: Abstract We consider the scheduling problem in which two agents (agents A and B), each having its own job set (containing the A-jobs and B-jobs, respectively), compete to process their own jobs in a two-machine flowshop. Each agent wants to maximize a certain criterion depending on the completion times of its jobs only. Specifically, agent A desires to maximize either the weighted number of just-in-time (JIT) A-jobs that are completed exactly on their due dates or the maximum weight of the JIT A-jobs, while agent B wishes to maximize the weighted number of JIT B-jobs. Evidently four optimization problems can be formulated by treating the two agents’ criteria as objectives and constraints of the corresponding optimization problems. We focus on the problem of finding the Pareto-optimal schedules and present a bicriterion analysis of the problem. Solving this problem also solves the other three problems of bicriterion scheduling as a by-product. We show that the problems under consideration are either polynomially or pseudo-polynomially solvable. In addition, for each pseudo-polynomial-time solution algorithm, we show how to convert it into a two-dimensional fully polynomial-time approximation scheme for determining an approximate Pareto-optimal schedule. Finally, we conduct extensive numerical studies to evaluate the performance of the proposed algorithms.

Keywords: Two-agent scheduling; Flowshop; Bicriterion analysis; Two-dimensional FPTAS (search for similar items in EconPapers)
Date: 2017
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (6)

Downloads: (external link)
http://link.springer.com/10.1007/s10951-017-0511-7 Abstract (text/html)
Access to the full text of the articles in this series is restricted.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:jsched:v:20:y:2017:i:4:d:10.1007_s10951-017-0511-7

Ordering information: This journal article can be ordered from
http://www.springer.com/journal/10951

DOI: 10.1007/s10951-017-0511-7

Access Statistics for this article

Journal of Scheduling is currently edited by Edmund Burke and Michael Pinedo

More articles in Journal of Scheduling from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-03-20
Handle: RePEc:spr:jsched:v:20:y:2017:i:4:d:10.1007_s10951-017-0511-7