Optimal System Planning with Fuel Shortages and Emissions Constraints
Michael Einhorn
The Energy Journal, 1983, vol. Volume 4, issue Number 2, 73-90
Abstract:
Electric utility system planners must design system capacity expansion paths that satisfy generation requirements at least cost. Historically, doing this required information regarding the system load duration curve and alternative fuel and capital costs. By putting fuel and capital costs into a linear program, system designers could then calculate the amount of electricity that base, intermediate, and peaking plants should generate and how much capacity each plant type should have.
JEL-codes: F0 (search for similar items in EconPapers)
Date: 1983
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.iaee.org/en/publications/ejarticle.aspx?id=1586 (text/html)
Access to full text is restricted to IAEE members and subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:aen:journl:1983v04-02-a06
Ordering information: This journal article can be ordered from
http://www.iaee.org/en/publications/ejsearch.aspx
Access Statistics for this article
More articles in The Energy Journal from International Association for Energy Economics Contact information at EDIRC.
Bibliographic data for series maintained by David Williams ().