Taking the business continuity programme to a corporate leadership role
Ira Messer
Journal of Business Continuity & Emergency Planning, 2009, vol. 4, issue 1, 8-13
Abstract:
The paper discusses a process to raise the awareness and value of your continuity programme to higher levels by leveraging existing data. It gives examples of how to utilise the structure of the Business Impact Analysis tool to develop an enterprise level of information capture, and then utilise that data to generate an enterprise level 'group think’ which results in incorporation of business continuity as a part of the business-as-usual model.
Keywords: business impact analysis; enterprise model; process incorporation (search for similar items in EconPapers)
JEL-codes: M1 M10 M12 (search for similar items in EconPapers)
Date: 2009
References: Add references at CitEc
Citations:
Downloads: (external link)
https://hstalks.com/article/4104/download/ (application/pdf)
https://hstalks.com/article/4104/ (text/html)
Requires a paid subscription for full access.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:aza:jbcep0:y:2009:v:4:i:1:p:8-13
Access Statistics for this article
More articles in Journal of Business Continuity & Emergency Planning from Henry Stewart Publications
Bibliographic data for series maintained by Henry Stewart Talks ().