CDM and the implications of a step change for small projects
Andrew Leslie
Journal of Building Survey, Appraisal & Valuation, 2016, vol. 5, issue 1, 65-69
Abstract:
This paper is based on a talk given to RICS Professional Group Board in Scotland at the Annual Conference in Glasgow on 12th November, 2015.
Keywords: Principal Designer; micro-businesses; proportionality; CDM duty holders; non-statutory roles (search for similar items in EconPapers)
JEL-codes: R3 (search for similar items in EconPapers)
Date: 2016
References: Add references at CitEc
Citations:
Downloads: (external link)
https://hstalks.com/article/2081/download/ (application/pdf)
https://hstalks.com/article/2081/ (text/html)
Requires a paid subscription for full access.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:aza:jbsav0:y:2016:v:5:i:1:p:65-69
Access Statistics for this article
More articles in Journal of Building Survey, Appraisal & Valuation from Henry Stewart Publications
Bibliographic data for series maintained by Henry Stewart Talks ().