Effects of M & E Planning Process on Performance of County Government Funded Water Projects in Kisii County, Kenya
Mutuku Mary Miombe (),
PhD Dr. Josephat Kwasira () and
PhD Dr. Benard Lango ()
International Journal of Entrepreneurship and Project Management, 2024, vol. 9, issue 4, 66 - 83
Abstract:
Purpose: Project Monitoring and Evaluation (M&E) is a critical component of the project management phase, which if not properly handled, may lead to project failure. Currently, Kenya faces transitional challenges from a centralized state to devolved governance system. This has prefigured both challenges and opportunities. The decentralized form of governance has exerted pressure on especially the performance of government water departments in funded water projects in counties. Despite this need most county governments initiate water projects without putting into consideration the importance of having effective M&E frameworks. One aspect that has not been given much consideration is effective implementation of M&E systems as advised by M & E experts. The aim of the study was to analyze the effect of M & E Planning process on performance of county government funded water projects in Kisii County Methodology: The study will adopt a descriptive survey design. The study target population includes 201 county water staff managing 90 water projects across the county. The census method was used to research the 201 staff involved in water projects. The primary data was collected by use of questionnaires and Key Informant interviews. Quantitative data was analyzed by employing descriptive statistics and inferential analysis, and the results were presented by tables and figures. Whereas, qualitative data was done through narrative analysis and presented in form of verbatim and narrations. Findings: M&E planning enables the construction of a logical framework that acts as a roadmap guiding the project's progress and allowing the stakeholders to understand the relationships between different project elements. The positive effect of M&E planning on project implementation affirms the pivotal role of this planning process in guiding and optimizing the execution of water-funded projects in Kisii County. Unique Contribution to Theory, Practice and Policy: This study was anchored in the program theory. Project managers and policymakers should emphasize the importance of these planning components, recognizing them as integral drivers of project success. Furthermore, capacity-building initiatives focusing on these planning aspects can further enhance the efficiency and effectiveness of M&E planning practices.
Keywords: Project Monitoring and Evaluation; Planning Process; Performance; County Government Funded Water Projects (search for similar items in EconPapers)
Date: 2024
References: Add references at CitEc
Citations:
Downloads: (external link)
https://www.iprjb.org/journals/index.php/IJEPM/article/view/3119/3709 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:bdu:oijepm:v:9:y:2024:i:4:p:66-83:id:3119
Access Statistics for this article
More articles in International Journal of Entrepreneurship and Project Management from IPRJB
Bibliographic data for series maintained by Chief Editor ().