UNANTICIPATED CONSEQUENCES OF A.I.D. PROJECTS: LESSONS FROM IMPACT ASSESSMENT FOR PROJECT PLANNING

Kurt Finsterbusch and Warren A. Van Wicklin

Review of Policy Research, 1988, vol. 8, issue 1, 126-136

Abstract: We examine lJ.S. Agency for International Development project designs as described in pre‐project design documents arid compare them using document review protocols to project outcomes as described in project impact evaluation reports for 40 projects. From this we draw three major conclusions concerning project designs: (1)most are unrealistic – estimated outputs greatly exceed actual outputs at the same time that considerable cost overruns occur, (2) they do not adequately assess the feasibility of the implementation, maintenance, and use of the project and its outputs, and (3) they do not adequately assess potential negative impacts. In light of these shortcomings we offer several recommendations for consideration and testing.

Date: 1988
References: Add references at CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
https://doi.org/10.1111/j.1541-1338.1988.tb00922.x

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:bla:revpol:v:8:y:1988:i:1:p:126-136

Ordering information: This journal article can be ordered from
http://www.wiley.com/bw/subs.asp?ref=1541-132x

Access Statistics for this article

Review of Policy Research is currently edited by Christopher Gore

More articles in Review of Policy Research from Policy Studies Organization Contact information at EDIRC.
Bibliographic data for series maintained by Wiley Content Delivery ().

 
Page updated 2025-03-19
Handle: RePEc:bla:revpol:v:8:y:1988:i:1:p:126-136