Evaluation of I-10 Pomona (07-181304) Long-Life Pavement Rehabilitation Costs
John T Harvey,
Nicholas J Santero and
Mary Fermo G
Institute of Transportation Studies, Working Paper Series from Institute of Transportation Studies, UC Davis
Abstract:
This technical memorandum summarizes the analysis performed to evaluate the cost of the Long-Life Pavement Rehabilitation Strategies (LLPRS) program. This study is part of the effort to develop an Integrated Pavement Strategy Decision Support System to allow engineers to analyze efficient allocation of financial resources when planning pavement projects. For this study, cost performances were analyzed for a long-life pavement project on Interstate 10 (EA 07-181304) in Pomona between the 210/57/10 interchange to Garey Avenue undercrossing. The project studied (EA 07-181304) is a 3.4 mile segment of the San Bernardino Freeway. It was the first concrete LLPRS project constructed and incorporated the use of Fast Setting Hydraulic Cement Concrete (FSHCC). The contract was awarded to Morrison Knudsen Corporation at $15,998,000. Construction began in April 1999 and was completed at the end of July 2000.
Keywords: Engineering; UCPRC-TM-2005-05 (search for similar items in EconPapers)
Date: 2005-06-01
References: Add references at CitEc
Citations:
Downloads: (external link)
https://www.escholarship.org/uc/item/339180q7.pdf;origin=repeccitec (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:cdl:itsdav:qt339180q7
Access Statistics for this paper
More papers in Institute of Transportation Studies, Working Paper Series from Institute of Transportation Studies, UC Davis Contact information at EDIRC.
Bibliographic data for series maintained by Lisa Schiff ().