EasyConnect: Low-Speed Modes Linked to Transit Planning Project
Susan Shaheen and
Caroline Rodier
Institute of Transportation Studies, Working Paper Series from Institute of Transportation Studies, UC Davis
Abstract:
The EasyConnect Low-Speed Modes Linked to Transit Planning Project (TO 5113) project represents the integration of innovative strategies to enhance transit use during the development and construction of a suburban transit oriented development at the Pleasant Hill Bay Area Rapid Transit (BART) District station in the East San Francisco Bay Area. This planning project brings together a unique partnership including small technology businesses, transportation agencies, city and county government, and academia. The project components include the introduction of shared-use low speed mode vehicles and electronic lockers at the proposed TOD. The evaluation of the EasyConnect field operational test (TO 6113-the next phase of this initiative) will provide insights into whether the introduction and integration of low-speed modes and elockers at the Pleasant Hill BART station can significantly increase transit access/use and cost effectively provide a last mile solution.
Date: 2006-06-01
References: View complete reference list from CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
https://www.escholarship.org/uc/item/7xd8q2p7.pdf;origin=repeccitec (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:cdl:itsdav:qt7xd8q2p7
Access Statistics for this paper
More papers in Institute of Transportation Studies, Working Paper Series from Institute of Transportation Studies, UC Davis Contact information at EDIRC.
Bibliographic data for series maintained by Lisa Schiff ().