Assessing the Impact of Fiscal Incentives on the Investment Feasibility of Geothermal Projects in Indonesia: A Value-at-Risk approach
Andi Susmanto (),
Akhmad Hidayatno (),
Andri D. Setiawan () and
Dendy Rio Casillas Pratama ()
Additional contact information
Andi Susmanto: Systems Engineering, Modelling and Simulation, Industrial Engineering Department, Faculty of Engineering, Universitas Indonesia, Kampus Baru UI Depok, Indonesia; & Ministry of Energy and Mineral Resources, Jakarta, Indonesia.
Akhmad Hidayatno: Systems Engineering, Modelling and Simulation, Industrial Engineering Department, Faculty of Engineering, Universitas Indonesia, Kampus Baru UI Depok, Indonesia,
Andri D. Setiawan: Systems Engineering, Modelling and Simulation, Industrial Engineering Department, Faculty of Engineering, Universitas Indonesia, Kampus Baru UI Depok, Indonesia,
Dendy Rio Casillas Pratama: Systems Engineering, Modelling and Simulation, Industrial Engineering Department, Faculty of Engineering, Universitas Indonesia, Kampus Baru UI Depok, Indonesia,
International Journal of Energy Economics and Policy, 2026, vol. 16, issue 2, 788-808
Abstract:
This study assesses the impact of fiscal incentives on the investment feasibility and risk profile of geothermal power projects in Indonesia. Geothermal energy is central to the country's clean-energy transition, yet high exploration costs, long development timelines, and limited fiscal support constrain private investment. To address these challenges, a quantitative analysis was conducted using an integrated Discounted Cash Flow (DCF) model and Value-at-Risk (VaR) analysis. A stochastic financial model for a 50 MW geothermal power plant was simulated over 1000 Monte Carlo iterations across five policy scenarios: Business-as-Usual (BAU), Value-Added Tax (VAT) removal, Land and Building Tax (LBT) removal, tax holiday, and a combined total incentive package. Results show that fiscal incentives improve project profitability while affecting financial volatility. The BAU case yields a mean Net Present Value (NPV) of - USD 8.4 million and an Internal Rate of Return (IRR) of 9.39%, whereas the Total Incentive scenario achieves + USD 0.38 million NPV and 10.03% IRR. The VaR analysis indicates reduced downside loss probability but greater dispersion of returns, suggesting a high-risk, high-return profile. Sensitivity results highlight power-plant EPC and drilling costs as dominant risk drivers.
Keywords: geothermal energy; fiscal incentives; Value-at-Risk; investment feasibility; Monte Carlo simulation; Indonesia (search for similar items in EconPapers)
Date: 2026
References: Add references at CitEc
Citations:
Downloads: (external link)
https://econjournals.com/index.php/ijeep/article/download/22322/9818 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eco:journ2:v:16:y:2026:i:2:id:22322
Ordering information: This journal article can be ordered from
https://econjournals.com/index.php/ijeep
DOI: 10.32479/ijeep.22322
Access Statistics for this article
More articles in International Journal of Energy Economics and Policy from International Journal of Energy Economics and Policy
Bibliographic data for series maintained by Monica Sinhat ().