Assessing the accuracy of electricity production forecasts in developing countries
Jevgenijs Steinbuks
International Journal of Forecasting, 2019, vol. 35, issue 3, 1175-1185
Abstract:
This study assesses the accuracy of time series econometric methods for forecasting electricity production in developing countries. An analysis of the historical time series for 106 developing countries over the period 1960–2012 demonstrates that econometric forecasts are highly accurate for the majority of these countries. These forecasts have much smaller errors than the predictions of simple heuristic models, which assume that electricity production grows at an exogenous rate or is proportional to the real GDP growth. However, the quality of the forecasts diminishes for the countries and regions, where rapid economic and structural transformation makes it difficult to establish stable historical production trends.
Keywords: Developing countries; Electricity demand forecasting; Time series econometric models; Forecast accuracy; Power generation investment planning (search for similar items in EconPapers)
Date: 2019
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (5)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0169207019300688
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:intfor:v:35:y:2019:i:3:p:1175-1185
DOI: 10.1016/j.ijforecast.2019.04.009
Access Statistics for this article
International Journal of Forecasting is currently edited by R. J. Hyndman
More articles in International Journal of Forecasting from Elsevier
Bibliographic data for series maintained by Catherine Liu ().