EconPapers    
Economics at your fingertips  
 

Real option analysis of aircraft acquisition: A case study

Qiwei Hu and Anming Zhang

Journal of Air Transport Management, 2015, vol. 46, issue C, 19-29

Abstract: This paper demonstrates that aircraft acquisition by airlines may contain a portfolio of real options (flexible strategies) embedded in the investment's life cycle, and that if airlines rely solely on the static NPV method, they are likely to underestimate the true investment value. Two real options are investigated: i) the “shutdown-restart†option (a carrier may shutdown a plane if revenues are less than costs, but restarts it if revenues are more than costs), and ii) the option to defer aircraft delivery. We quantify the values of these options in a case study of a major U.S. airline. The economic insight could help explain observed capital expenditures of airlines, and serve as a rule of thumb in evaluating capital budgeting decisions. A compound option (consisting of both the shutdown-restart and defer options) is also analyzed.

Keywords: Aircraft investment; Uncertainty; Real option analysis; Managerial flexibility; Binomial-tree model (search for similar items in EconPapers)
Date: 2015
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (11)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0969699715000381
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:jaitra:v:46:y:2015:i:c:p:19-29

DOI: 10.1016/j.jairtraman.2015.03.010

Access Statistics for this article

Journal of Air Transport Management is currently edited by Anne Graham

More articles in Journal of Air Transport Management from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:jaitra:v:46:y:2015:i:c:p:19-29