EconPapers    
Economics at your fingertips  
 

Analysis of the implementation of effective waste management practices in construction projects and sites

Marta Gangolells, Miquel Casals, Núria Forcada and Marcel Macarulla

Resources, Conservation & Recycling, 2014, vol. 93, issue C, 99-111

Abstract: In this paper, the implementation of effective waste management practices in construction projects and sites is analyzed, using data from a survey answered by 74 Spanish construction companies based in Catalonia. Most commonly implemented practices were found to be on-site cleanliness and order, correct storage of raw materials, and prioritization of the nearest authorized waste managers. The least widespread practices were the use of a mobile crusher on site, the creation of individualized drawings for each construction site, and the dissemination of the contents of the waste management plan to all workers, to help them to meet its requirements. Waste regulations for construction and demolition, and the corresponding construction waste management facilities, were designed before the recession in the Spanish construction sector. Current waste generation rates are still below predicted levels, and the infrastructure was designed for five times more waste generation. Even so, the percentage of reused and recycled waste currently amounts to 43%. Survey respondents highlighted various instruments and measures that would make the management of construction and demolition waste more sustainable. Most of the opportunities identified by construction firms are within the scope of government and related to a combined system of bonus and penalties and the establishment of environmental awareness and training programmes for all the stakeholders. Within the scope of authorized waste managers, firms suggested improvements such as the standardization of fees, a reduction of the time until the issue of waste management certificates, a higher number of inspections, and a change in the current model of a few large construction waste management facilities. This research is useful to better understand the current status of construction and demolition waste management in construction projects and sites. Thus, the results of this research will guide policy makers and relevant stakeholders such as contractors, clients, architects and engineers to achieve the EU target of recovering 70% of construction and demolition waste in 2020. In this sense, reliable information can help governments and professional associations to set future C&D waste management regulations, training programmes and dissemination tools, inspections, etc.

Keywords: Construction and demolition waste management; Construction companies; Construction sites; Waste management practices; Questionnaire; Spain (search for similar items in EconPapers)
Date: 2014
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (7)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0921344914002249
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:recore:v:93:y:2014:i:c:p:99-111

DOI: 10.1016/j.resconrec.2014.10.006

Access Statistics for this article

Resources, Conservation & Recycling is currently edited by Ming Xu

More articles in Resources, Conservation & Recycling from Elsevier
Bibliographic data for series maintained by Kai Meng ().

 
Page updated 2025-03-19
Handle: RePEc:eee:recore:v:93:y:2014:i:c:p:99-111