Critical factors and risk allocation for PPP policy: Comparison between HSR and general infrastructure projects
Jui-Sheng Chou,
H. Ping Tserng,
Chieh Lin and
Chun-Pin Yeh
Transport Policy, 2012, vol. 22, issue C, 36-48
Abstract:
This study compared the use of public–private partnership (PPP) policy between high speed rail (HSR) projects and general infrastructure projects. Based on extensive literature reviews, drivers for adopting PPP strategy, critical success factors, and preferred risk factor allocation were collected to design a structural questionnaire for professionals in Taiwan and to elicit their PPP project experience. Analytical findings reveal that most experience learnt from general infrastructure projects is applicable in HSR projects after proper modification. This study provides a valuable reference for stakeholders interested in executing HSR via PPP.
Keywords: Public–private partnerships; High speed rail; Critical success factor; Risk allocation; Confirmatory factor analysis; Importance-performance analysis (search for similar items in EconPapers)
Date: 2012
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (21)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0967070X12000790
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:trapol:v:22:y:2012:i:c:p:36-48
Ordering information: This journal article can be ordered from
http://www.elsevier.com/wps/find/supportfaq.cws_home/regional
https://shop.elsevie ... _01_ooc_1&version=01
DOI: 10.1016/j.tranpol.2012.05.009
Access Statistics for this article
Transport Policy is currently edited by Y. Hayashi
More articles in Transport Policy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().