Exploring critical supplier selection criteria for performance-based contracting: insights from the defense industry
Hasan Uvet,
John Dickens,
Justin D'Agostino and
Sanjaya Mayadunne
International Journal of Productivity and Performance Management, 2026, vol. 75, issue 5, 1676-1703
Abstract:
PurposeThis study explores critical supplier selection criteria in performance-based contracting (PBC), emphasizing the pre-contractual phase where supplier evaluation mitigates adverse selection risks.Design/methodology/approachThis study reveals the important supplier selection criteria in PBC by investigating the logical links in data collected from literature reviews, previous studies, secondary data and four awarded PBCs within the defense industry. Content analysis methodology is employed as an inductive exploratory research tool that allows in-depth research when there is little knowledge to understand the phenomena in question.FindingsSix supplier selection criteria emerged for successful PBC arrangements: (1) capability to deliver outcomes; (2) reliability, maintainability, and supportability improvements; (3) buyer–supplier (public–private) partnering; (4) systems approach capability; (5) footprint reduction and obsolescence management; (6) cost ownership.Research limitations/implicationsThis study advances supplier selection research in PBC by applying agency theory to pre-contractual risk and connecting selection criteria with performance management and measurable outcomes. In future studies, interviews with PBC managers can be conducted to validate these selection criteria across both public and private domains.Practical implicationsThe findings of this study provide guidance on how to use critical selection criteria to reduce the risk of high dependence on suppliers in PBCs by avoiding the selection of the wrong supplier. Thus, buyers can avoid the “adverse selection” agency problem by usage of those appropriate selection criteria. This study equips buyers with a roadmap to appropriately select suppliers through PBC governance.Originality/valueBy linking supplier selection with performance management, this study offers practical guidance for high dependency contracting environments.
Keywords: Performance-based contracting; Outcome-based contracting; Supplier selection criteria; Adverse selection problem; Content analysis; supplier evaluation (search for similar items in EconPapers)
Date: 2026
References: Add references at CitEc
Citations:
Downloads: (external link)
https://www.emerald.com/ijppm/article/75/5/1676/13 ... lection-criteria-for (text/html)
https://www.emerald.com/ijppm/article-pdf/75/5/167 ... m-04-2025-0322en.pdf (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eme:ijppmp:ijppm-04-2025-0322
DOI: 10.1108/IJPPM-04-2025-0322
Access Statistics for this article
International Journal of Productivity and Performance Management is currently edited by Dr Aylin Ates and Dr Berk Kucukaltan
More articles in International Journal of Productivity and Performance Management from Emerald Group Publishing Limited
Bibliographic data for series maintained by Emerald Support ().